abu-dhabi-financial-center-abu-dhabi

Abu Dhabi Financial Center – Abu Dhabi

Management: Mubadala – John Buck International
Consultant: Goettsch Partners
Site Management: Oger Abu Dhabi
Internal and External Stone Works
• Preparation of shop drawings, cutting list and working details
• Design and supply of secondary steel structure
• Installation of marble and granite
• Approx. 51.000 Sqm.

etihad-towers-abu-dhabi

Etihad Towers – Abu Dhabi

Management: Sheikh Suroor Bin Moha’d Al Nahyan Projects Department (SSPD)
Consultant: Aecom
Site Management: Arabian Construction Company
Internal and External StoneWorks
• Preparation of  shop drawings, cutting list and working details
• Design and supply of secondary steel structure
• Supply and installation of natural stones
• Approx. 45.000 Sqm.

central-park-cp-08-dubai

Central Park CP-08 – Dubai

Management: Dubai Properties
Consultant: Goettsch Partners
Site Management: Arabtec Construction LLC
Supply of natural stone
• Preparation of  shop drawings, cutting list and working details
• Approx. 4.000 Sqm., Approx

Dubai Word Central International Airport – Dubai

Management: Department of Civil Aviation
Consultant: Dar Al Handasah Adpi JV
Site Management: MAK&Sons
Internal and External StoneWorks
• Preparation of  shop drawings, cutting list and working details
• Design and supply of secondary steel structure
• Supply and installation of marble and granite
• Approx. 35,000 Sqm.

capital-plaza-development-abu-dhabi

Capital Plaza Development – Abu Dhabi

Management: Real Estate Investment & Service Company (REISCO)
Consultant: Jacobs CRSS International
Site Management: Arabian Construction Company
External Stone Cladding Works
• Preparation of shop drawings, cutting lists and working details
• Design and supply of secondary steel structure
• Supply and installation of granite
• Approx.60,000 Sqm.

al-rostamani-maze-tower-dubai

Al Rostamani Maze Tower – Dubai

Management: Abdullah Hassan AlRostamani
Consultant: Design Architecture Bureau
Site Management: Al Rostamani Pegel LLC External Cladding Works
• Preparation of shop drawings,cutting lists and working details
• Design and supply of secondary steel structure
• Installation of marble and granite
• Approx.25,000 Sqm

al-gurm-resort-development-abu-dhabi

Al Gurm Resort Development – Abu Dhabi

Management: Parsons International
Consultant: Dar Al Handasah
SiteManagement: Six Construct Ltd.
Internal and External Flooring Works
• Preparation of shop drawings,cutting lists and working details
• Installation of marble and granite
• Approx.40,000Sqm

ritz-carlton-hotel-apartments-dubai

Ritz Carlton Hotel & Apartments – Moscow

Management: Union Properties
Consultant: Arc International
Site Management: Bouygues-Target JV
External Stone Cladding Works
• Preparation of shop drawings, cutting lists and working details
• Design and supply of secondary steel structure
• Installation of marble and granite
• Approx. 30,000 Sqm

sky-gardens-tower-dubai

Sky Gardens Tower – Dubai

Management: First Dubai Real Estate
Consultant: WS Atkins & Partners Overseas
Site Management: Arabtec Construction LLC
External Cladding Works
• Preparation of shop drawings, cutting lists and working details
• Design and supply of secondary steel structure
• Supply and installation of granite
• Approx. 51,000 Sqm.

world-trade-center-residence-dubai

World Trade Center Residence – Dubai

Management: Turner International
Consultant: Jung Brannen Associates Inc.
Site Management: Dubai Contracting Company
External Marble Cladding and Paving Works
• Preparation of shop drawings, cutting lists and working details
• Design and supply of secondary steel structure
• Supply and installation of granite and limestone
• Approx. 12,000 Sqm.

sheikh-zayed-grand-mosque-abu-dhabi

Sheikh Zayed Grand Mosque – Abu Dhabi

Management: Hill International
Consultant: Halcrow International
Site Management: SIXCO-ACC JV
Package 6 – Arcade Marble Works
Package 7 – Main Entrances, Minarets & Haram Marble Works
Package 25 – Column Finishing Works for Main Prayer Hal
• Preparation of shop drawings, cutting lists and working details
• Design and supply of secondary steel structure
• Installation of white Sivec Marble
• Approx. 95,000Sqm.

the-conference-palace-hotel-abu-dhabi

The Conference Palace Hotel – Abu Dhabi

Management: TURNER International
Granite Works
• Design, Shop Drawing, Supply and Installation
• Preparation of shop drawings, cutting list
• Installation of natural stones
PACKAGE 22C & D (As General Contractor) Approx. 65,000Sqm.
PACKAGE 22A & B (As Subcontractor to ASCON MARBLE) Approx. 45,000 Sqm.

shangrila-hotel-dubai

Shangrila Hotel – Dubai

Contractor: Al Habtoor – Roberts Murray JV
Consultant: NORR
External Granite Installation & Shop Drawing
Approx. 25,000 Sqm, Approx

fairmont-hotel-dubai

Fairmont Hotel – Dubai

Contractor: Dubai Contracting Co. / Arab Technical Const. Co.
External Granite Installation
Approx. 35,000 Sqm.

adma-opco-adgas-complex-abu-dhabi-2

Admo-Opco & Adgas HQ Complex – Abu Dhabi

Contractor: Six Construc tLtd.
External & Internal Marble & Granite Design & Installation
Approx. 37,000 Sqm.

adnoc-ogd-abu-dhabi

Adnoc OGD – Abu Dhabi

Contractor: Consolidated Contractors International Company
External & Internal Marble & Granite Supply & Installation
Approx. 5,000 Sqm., Approx. AED 5,500,000.00
ZADCO-GASCONEWHEADQUARTERCOMPLEX-ABUDHABI
Contractor:PhillipHolzmanAG-BalfourBeatyLLC.JV
External&InternalMarble&GraniteDesign,Supply&InstallationApprox.32,000Sqm.

adco-headquarter-abu-dhabi

Adco Headquarter – Abu Dhabi

Contractor: Laing AbuDhabi LLC
External Walls, Installation only

abu-dhabi-trade-center-abu-dhabi-2

Abu Dhabi Trade Center – Abu Dhabi

Contractor: Campenon Bernard SGE – Six Construc tLtd. JV
External Granite Design & Installation
Approx.15,000 Sqm.

national-bank-of-abu-dhabi

National Bank of Abu Dhabi

Contractor: Al Habtoor – Roberts Murray JV
External & Internal Walls, Floors Works, supply of FixingSystem
20,000 Sqm Approx

qatar-education-city-convention-center-doha-2

Qatar Education City Convention Center – Doha

Contractor: BAYTUR / Turkey
Supply, Design and Installation
Approx 71,000m2

al-wajba-palace-doha

Al Wajba Palace – Doha

Contractor: Al Seal Construction Company
Supply & Design and Installation
Approx 13,000 m2

school-of-foreign-services-doha

School of Foreign Services – Doha

Contractor: MIDMAC Construction Company
Supply & Design and Installation
Approx 43,000 m2

lagoon-mall-doha

Lagoon Mall – Doha

Contractor: Al Seal Construction Company
Supply & Design and Installation
Approx 11,500 m2

new-doha-international-airport-package19-doha

New Doha International Airport (Package 19) – Doha

Contractor: CDC & Takenaka JV
Supply, Design and Installation
Approx 56,000 m2

mia-museum-of-islamic-art-doha

MIA – Museum Of Islamic Art – Doha

Contractor: BAYTUR / Turkey
Supply, Design and Installation
Approx 92,000 m2

texas-college-of-engineering-doha-2

Texas College Of Engineering – Doha

Contractor: MIDMAC Construction Co. WLL.
Supply and Installation
Approx. 45,000 m2

sports-city-tower-doha

Sports City Tower – Doha

Contractor: SIXCO – MIDMAC JV
External & Internal Stone Works
Approx. 18,500 m2

culture-village-doha

Culture Village – Doha

Contractor: SIXCO – MIDMAC JV
External & Internal Stone Works
Approx. 18,500 m2

four-season-hotel-nile-plaza

Four Season Hotel Nile Plaza

Contractor: Hyundai Construction International
Consultant: Bechtel International
External & Internal Cladding
Supply of Fixing System
65,000 Sqm

bibliotekha-alexandrina-library-alexandria

Bibliotekha Alexandrina Library – Alexandria

Contractor: Balfour Beatty & Arab Contractors JV
External & Internal Granite Design & Installation

nile-city-cairo

Nile City – Cairo

Contractor: Besix Construct Co. Ltd.
Internal & External Cladding
Approx. 30,000 m2

Pyramids Height – Cairo

Contractor: Contain & Samcrete JV
Internal & External Cladding
Approx. 18,600 m2

royal-meridien-hotel-cairo

Royal Meridien Hotel – Cairo

Contractor: Six Construct Co. Ltd.
Design and Installation Internal & External Floors and Walls
Approx. 6,000 m2

grand-hyatt-hotel-cairo

Grand Hyatt Hotel – Cairo

Contractor: Besix – Orascom JV
Internal Stone Works
Approx. 27,000 m2

conrad-hotel-cairo

Conrad Hotel – Cairo

Contractor: Besix – Orascom JV
Internal Stone Works
Approx. 32,000 m2

golden-pyramids-plaza

Golden Pyramids Plaza

Contractor: CCIC & ORASCOM JV
Internal & External Cladding
Approx. 12,000 m2

us-embassy-kingston-jamaica

Us Embassy – Kingston / Jamaica

Contractor: JA .JONES
External & Internalworks
Approx 8,000 m2

us-embassy-astana-kazakhistan

Us Embassy – Astana / Kazakhistan

Contractor: JA JONES
Exterior & Interior Stone Works – 14,000 m2

us-embassy-erivan-armenia

Us Embassy – Erivan / Armenia

Contractor: JA JONES
Exterior Stone Works
Approx. 13,000 m2

us-embassy-haiti

Us Embassy – Haiti

Contractor: JA JONES
External & Internal Stone Works + Landscaping

centralbankofmauritius

Central Bank Of Mauritius.

Contractor: POLAR STONE (UK) LTD.
External / Internal Granite Cladding
Approx. 10,000 m2

usembassyjuarezmexico

Us Embassy – Juarez / Mexico

Contractor: CADELL
External & Internal Stone Works + Landscaping

kingdomcenterprojectriyadh

Kingdom Center Project – Riyadh

Contractor: El Seif Engineering & Contracting Est.
Consultant: Omrania & Associates
Design & supply of fixing system
External & Internal walls & floors
63,000 Sqm

hiltonhotelcomplexjeddah

Hilton Hotel & Complex – Jeddah

Contractor & Consultant: Haif Trading & Contracting Est Design
Installation of External Granite Walls
67,000 sqm

jamjoomcommercialcenterjeddah

Jamjoom Commercial Center – Jeddah

Contractor: J.V. Saad Polensky & Zoellner Co.Ltd / G.Epple Arabia
Consultant: Jamjoom Consultants
Design: Studio Vale Fixing only of 90,000sqm

H.r.h. Prince Sultan Thowwal Beach Palace.

Contractor: M. Binladin Organisation – SBD
Consultant: Saudi Diyar Consultants
External cladding
14,000sqm

Governor House Of Makkah.

Contractor: M.Binladin Organisation
Consultant: Saudi Diyar
Consultants: Marble and granite
Supply and fixing External wall cladding 25,000 sqm.
Internal and external flooring
11.000 sqm

Chamber Of Commerce & Industry.

Contractor: Saudi Constructioneers Est.
Consultant: Omrania & Associates.
Partial external fixing and complete internal fixing.

saudibritishbankheadquartersriyadh

Saudi British Bank Headquarters. – Riyadh

Contractor: Saudi Contructioneers Est.
Consultant: Laing & Wimpey
Supply and fixing of travertine marble.

Haram Extention Project 09.

Contractor: M.Binladin Organisation
Consultant: Al Darwish Consultants
External & Internal Supply and fixing.
Approx.6,000sqm

justicecourtcomplex

Justice Court Complex

Contractor: M.Binladin Organisation.
Consultant: Saudi Diyar Consultants.
Supply and fixing of approx.15.000sqm.

gaspromcomplexbuildingmoscow

Gasprom Complex Building – Moscow

Contractor: Gama Construction Ankara
External Granite Cladding Design & installation
50.000 sqm Internal Terrazo Flooring
Supply & Installation
19.000sqm Internal Marble Cladding & Flooring
(FBlok & Turkish Bath)

usadbacentermoscow

Usadba Center – Moscow

Contractor: Usadba Moscow
External & Internal Granite Design,
Supply & Installation 30.000 Sqm

whitehousemoscow

White House – Moscow

Contractor: Gama Construction Ankara
External Marble Repairing & Cleaning:
40.000 sqm

Moscow Bank – Moscow

Contractor: Tekser Cons. A.S.
External Granite Cladding, Supply & Installation 2.500sqm
Internal Marble & Granite Cladding & Flooring,
Supply & installation 2.000 sqm

usadbacentermoscow

Usadba Center – Moscow

Contractor: Usadba Moscow
External & Internal Granite Design,
Supply & Installation 30.000 Sqm

riversidehotelmoscow

Riverside Hotel – Moscow

Contractor: Enka Construction
External Granite Design,
Supply & Installation
22.000 Sqm

white-square-office-centre-moscow

White Square Office Centre – Moscow

Contractor: Enka Construction
External Granite Design,
Supply & Installation
18.000 Sqm

sabanci-center-istanbul-twin-towers

Sabanci Center Istanbul ( Twin Towers )

Contractor: Koray A.S.
Consultant: Sabanci Holding
Supply,Design and Fixing
Approx.4,500,000.-DM.
External granite cladding,
Approx.16,000 sqm. Internal Granite & Marble approx 20,000 sqm.

sabanci-university-istanbul

Sabanci University Istanbul

Contractor: Koray A.S.
Consultant: Sabanci Holding
Supply, Design & Installation External & Internal Stone
60,000 Sqm

olive-grove-tower-istanbul

Olive Grove Tower Istanbul

Contractor: Dogus Construction A.S.
Design & Installation External Granite
10,000 Sqm

new-office-building-for-usa-embassy-istanbul

New Office Building For U.s.a. Embassy – Istanbul

Contractor: Caddell Construction – USA
Consultant: OBO–USA
External & Internal stone works
Design, supply and installation 15,000 Sqm

ramada-resort-hotel-antalya

Ramada Resort Hotel – Antalya.

Contarctor: Gama / Ankara
Consultant: Taylor Woodrow
Internal / External marble cladding and flooring of approx. 8,000sqm.

hotelfalezsteigenbergerantalya

Hotel Falez / Steigenberger Antalya

Contractor: Orsa / Istanbul
Internal, external cladding and flooring
Tiling for bathrooms approx. 7,000sqm.

hiltonhotelizmir

Hilton Hotel Izmir

Contractor: Gunal Contruction Co. / Ankara
Consultant: Laing International
External cladding 17.000sqm.
Internal Cladding & Flooring
7,000sqm. Tiling for bathroom sapprox. 3,000sqm

hotelsheratonvoyagerantalya

Hotel Sheraton Voyager Antalya

Contractor: Askon Insaat
Consultant: Cementatio n /London
Internal / Externaltiling works

hotelsheratonankara

Hotel Sheraton Ankara

Contractor: Joint Venture Heilit Woerner / KorayInsaat
Consultant: GMP / Hamburg
Internal / External Marble Cladding and flooring
9,000sqm. Tiling for bathrooms approx. 3,000sqm

conradhotelinternationalistanbul

Conrad Hotel International Istanbul

Contractor: Yeditepe Beynelmilel Turizm ve Tic. A.S.
Consultant: Bechtel Easter Ltd. / USA
Material supply and fixing.
External & Internal granite & marble cladding and flooring 20,000sqm.
Tiling works approx.6,000sqm.

adanahiltonsaadana

Adana Hilton Sa Adana

Contractor: Koray A.S.
Consultant: Sabanci Holding
Design, Supply & Installation,
External & Internal Granite and Marble
18,000 Sqm